Our dream of the Treehouse Hotel began by the concept and the thus resulting pictures.
According to the concepts preliminary works were carried out. Construction of the new dirty water channel, setting of the empty-pipes to the future treehouses and of the supply house. The empty-pipes are standing like organ-pipes. Through a gap they reach into the supply house.
Even more pipes, in the whole 800m were needed for all treehouses.
Now follows the small but sufficient supply-house.
Here water,electricity and network-cables meet and are distributed to each treehouse.
Finally the cover is put. In the background you see those plegs where the foundations will be made.
Now we are proceeding with the treehouses, even if it will take longer than we expected. First the treehouse Birkenhöhe (Birch-Heigth) is developed. Again and again bad weather demands covering of wood and isolation in order to keep them dry.
A lorry-crane lifts the single bars and in this case the second wall to their positions. In the foreground you see the foundation of the bridge leading barrier-freely to the treehouse
Ahornhöhe (Maple-Height). You can guess the supply-hous on the right.
The third wall of the treehouse Birkenhöhe is ready, talks with electricians are necessary.
A film showing the construction of the treehouse Ahornhöhe.